Connect the high-voltage (HV) cables, rotor cables, and ground (earth) cables. Route cables for the X-ray up/down switches and sensors.
Do not skip this section. A failed installation can lock you out of service mode or corrupt the main console.
Inspect for looseness or wear on the Large Filament pole of the HV cable. Error Code Troubleshooting: E17 (Over
, is a multi-stage procedure that transitions from mechanical assembly to electrical integration and final software calibration. 1. Mechanical Assembly and Hardware Setup
The system often includes a 4-way tabletop like the PBT-4 , which must be leveled to allow for smooth patient movement during radiography. drgem x ray service manual install
Secure the top rail to the ceiling (for floor-to-ceiling configurations).
The room must meet structural and radiation shielding requirements, as specified in the DRGEM GXR installation manual .
Before unboxing the equipment, ensure the X-ray room meets the minimum layout and safety requirements. Room Layout : Refer to the system-specific installation layout document
Verify that the tube stand, table, and wall stand move freely without binding. 3. High Voltage Cable and Electrical Connections Connect the high-voltage (HV) cables, rotor cables, and
Connect the X-ray tube stator cable to the matching terminals inside the generator cabinet (ensure correct phase wiring for proper tube rotation).
Before diving into the installation, you must understand the two main software layers of a DRGEM X-ray system:
Run each as Administrator. Reboot after the last installation.
Inspect the shock and tilt indicators on the wooden crates before opening. A failed installation can lock you out of
Installation and maintenance should only be performed by certified DRGEM service engineers. This guide is for educational purposes based on available documentation. 1. Pre-Installation Requirements
Visually inspect the X-ray tube, collimator, and generator casing for physical damage. Mechanical Installation Steps
Install the DRGEM software suite and enter the system license keys. DICOM Integration
Switch on the main facility circuit breaker, then power up the X-ray generator.
: Verify the room meets local radiation safety regulations.